Drainage of the foundation pit formed the landing funnel of underground water which induce rocky surface collapse; 基坑排水形成地下水降落漏斗,诱发岩溶地面塌陷;
Analysis of the operation phase of the tunnel, the tunnel under the different drainage flow to get the water level decline and the scope of dewatering funnel. 分析隧道营运阶段,在隧道的不同排水流量下水位的下降值和疏干漏斗的范围。